Alltel Stadium Club Renovations
Jacksonville Jaguars
Jacksonville Florida
Experience with the patron circulation around the two, three level, 77,000 s.f. premium ticket Club facilities prompted a redesign and redevelopment of the club areas in six months between seasons.
The area was infilled at level three using a composite steel and concrete deck design which created 2,500 additional s.f. in each club, and allowed the installation of new premium food and beverage services.
During this renovation the opportunity was taken to replace and upgrade floor and wall treatments, install improved lighting and plasma TV’s, upgrade point-of-sale and beverage distribution systems and re-dress existing retail outlets.