Consolidated Paint/Sandblast Facility
U.S. Navy
NSB Kings Bay, Georgia
Project Highlights:
- Facility streamlined painting/sandblasting operations into a centralized location which met EPA restrictions and reduced pollution
- 35,000 SF design-build pre-engineered, single-story, metal building housing areas for sandblasting and painting submarine components, some of which are the size of a tractor trailer
- Provided equipment, including compressors, dust collectors, paint/powdercoat/sandblast booths, bake/burn-off ovens and monorail cranes
- Facility also contains administrative spaces, breakrooms, showers, locker rooms and restrooms
- Self-performed the installation of over 90,000 SF of portland cement concrete paving, utilizing Haskell-owned Bidwell concrete paving equipment
- Incorporated sustainable design principles, focusing on energy conservation, recycling and reuse, life-cycle costing, environmental awareness and facility life extension
"Outstanding contractor - I would love to have them for every contract. The unity and coordination of Haskell's design-build team is a great benefit to project success and resolution of issues that come up."
Lt. Brian Nottingham
NSB Kings Bay